We waited a while to get the road done but Mackay Earthworx did a great job & the pricing was reasonable.
We are on a steep hill so the run off down the hill in heavy rain is amazing & it erodes terribly. Dave suggested reclaimed road asphalt. He agreed to put a couple of minor speed bumps or dips so that water running down the road would be diverted. He also put the nice council style pipe collars that have a flat horizontal base & a protruding vertical wall to help water control & reduce silting.
Dave did a full featured job, bob cat, water truck, bob cat, trip truck with asphalt, bob cat, proper road roller... & the result shows it.
I asked him to put a large top drain at the top of our hill as a diversion to reduce the water running straight down. It was made wide & low profile so maintenance or fire fighting vehicles could easily cross it.
We had some very heavy rain without any wash issues & the drive up is smooth.
Now I need to put up No Through Road signs...